Skip to Content

Rocky Mountain’s Trail Ridge Road Is Open For the Season

Trail Ridge Road in Rocky Mountain National Park is open for the season, the park said in a press release on Friday, May 31.

Due to melting snow on the road and the potential for freezing temperatures visitors should be prepared for icy conditions. At this time, nightly closures will not be implemented.

However, because weather conditions may change rapidly at higher elevations, park visitors should be prepared to adjust travel plans accordingly at any time and are encouraged to call the park’s Trail Ridge Road recorded status phone line at (970) 586-1222.

Park staff will update the recorded line when/if the road status changes.

Alpine Visitor Center, Trail Ridge Store and the large adjacent parking area are closed to all uses. Visitors must adhere to the barricades. Visitors entering the closure area will be cited.

Trail Ridge Road Near Rock Cut - Image credit: Rocky Mountain National Park
Trail Ridge Road Near Rock Cut – Image credit: Rocky Mountain National Park

Timed Entry Permit Reservations In Place For Trail Ridge Road

Rocky Mountain National Park has a timed entry permit reservation system in place during certain times of day.

There are two types of reservations available. One option is for the Bear Lake Road Corridor, which includes the entire corridor and rest of the park. This reservation period is from 5 a.m. to 6 p.m.

Another timed-entry option is for the rest of Rocky Mountain National Park, excluding the Bear Lake Road corridor, and includes Trail Ridge Road. This reservation period is from 9 a.m. to 2 p.m.

Permits issued using the reservation system will allow park visitors to enter the park within two-hour windows of availability. The reservation system will apply to all areas of the park. To learn more visit http://go.nps.gov/romo/timedentry.

When Does Trail Ridge Road Usually Open?

Trail Ridge Road historically opens on Memorial Day weekend; last year the road opened on May 26. The earliest the road has opened was on May 7, 2002; the latest June 26, 1943.

Trail Ridge Road is the highest continuous paved road in the United States, climbs to 12,183 feet and connects the towns of Estes Park and Grand Lake. Trail Ridge Road officially closed for the season last year on October 18.

National Park Service plow operators began clearing the snow in the middle of April. Crews from the west side of the park and crews from the east side of the park move along the road and eventually meet at the Alpine Visitor Center. The visitor center is the highest in the National Park Service, sitting at 11,796 feet above sea level.

Spring storms often impact plowing activities. This year, May storms with significant winds at higher elevations hampered snow plowing operations this year. Plow operators have encountered additional snow accumulation, significant wind resulting in deep snow drifts, freezing cold temperatures and ice.

For more information about Rocky Mountain National Park visit www.nps.gov/romo or call the park’s Information Office at (970) 586-1206. For a recorded status line on Trail Ridge Road please call (970) 586-1222.